Work Process |
Approximate Hours |
1. Foundation, Walls, and Floors |
1,500 |
|
a. Laying out and leveling |
|
|
b. Building and placing straight concrete forms |
|
|
c. Lining up and bracing concrete walls and columns |
|
|
d. Laying out footings |
|
|
e. Building irregular concrete forms |
|
|
f. Building forms for concrete stairways |
|
|
g. Laying out building lines |
|
2. Framing (Foundation and Walls) |
800 |
|
a. Laying out and framing sills and girders |
|
|
b. Framing and setting floor joists |
|
|
c. Erecting walls and partitions |
|
|
d. Lining up and bracing walls and partitions |
|
|
e. Installing sheathing and plastic grounds |
|
|
f. Building stagings |
|
|
g. Laying out walls and partitions |
|
3. Roofs |
700 |
|
a. Framing and setting common rafters |
|
|
b. Framing and setting valley rafters |
|
|
c. Framing and setting hip rafters |
|
|
d. Framing and setting jack rafters |
|
|
e. Applying sheathing, composition shingles, and other types of roof covering |
|
4. Exterior Mill Work |
1,000 |
|
a. Determining uses of tools, materials, and equipment |
|
|
b. Operating skill saw, electric drill, and sander |
|
|
c. Setting up and operating bench saw |
|
5. Interior Wall Covering |
500 |
|
a. Applying wood coverings |
|
|
b. Applying composition, sheet rock, and fiberboard |
|
|
c. Installing baseboards |
|
6. Floors |
500 |
|
a. Laying sub-floors |
|
|
b. Laying hardwood floors |
|
|
c. Erecting forms for concrete |
|
7. Stairs |
500 |
|
a. Laying out and cutting stair stringers for various types of stairways |
|
|
b. Laying out and cutting various treads |
|
|
c. Installing railings |
|
8. Interior Finish |
1,000 |
|
a. Cutting and fitting base |
|
|
b. Cutting and fitting molding |
|
|
c. Setting floor jambs |
|
|
d. Fitting and hanging windows |
|
|
e. Fitting and fastening hardware |
|
|
f. Fitting and hanging doors |
|
9. Miscellaneous |
1,500 |
TOTAL |
8,000 |